This local government roadway design project was designed to Tennessee Department of Transportation standards for contract letting. The project is approximately .7 mile in distance and features a totally new alignment based upon an Advanced Planning Report prepared by TDOT. Some of the complexities of the project which required consideration during the design process included: wetlands mitigation, signalized intersections, high percentage of trucks and recreational vehicles, a city park as well as railroad issues. Work elements of the final design included: surveying, traffic design, geotechnical design, hydraulic design, right-of-way and utility design. This project was completed in 2006.