TRC provided precast design and detailing services on this project. This project consists of a vertical expansion to the existing four level parking structure. The scope of the precast includes:
• Three additional levels of new construction at levels 5, 6 and 7.
• Two replacement levels of double tees at levels 1 and 2.
• Northwest and southwest stair/elevator towers.
• Northeast and southeast stair/elevator towers.
• Northeast temporary stair tower and enclosed bridge.
• Vehicular bridge connecting to existing west garage.
• Interior vehicular ramp structure