  • DESIGN TEAM:
  • ClientJess Burts Enterprises
  • Steel Supplier and Erector Steel Fabricators, LLC
  • Structural Engineers/Prime Consultant TRC Worldwide Engineering
  • New Construction 1,000,000 GSF
  • Construction Cost $30 Million

Seminole Hard Rock Parking Garage - Hollywood, Florida

TRC Worldwide Engineering, Inc., was the Prime Consultant, while providing structural engineering design, construction documents and construction administration services for this 2500-car steel parking garage for the Seminole Hard Rock Casino in Broward County. The structure is 1,000,000 square foot, over 70 feet tall, and over 1,100 feet long.

Design Challenges: The parking structure spans over an existing zoo with two (2) 120-foot long by two-story tall steel trusses (see photo). Nearly every pile cap was custom designed to adapt to extensive existing below-grade utilities.

Key Structural Components
  • Structural system is castellated steel floor beams and hot-rolled steel girders with a composite concrete floor slab over 3" VLI composite metal deck
  • Steel Columns and steel braced frames for lateral loads
  • All structural steel is hot dipped galvanized
  • Concrete tilt-up wall panels for stairway and elevator cores
  • Foundations are concrete pile caps on 16" auger-cast concrete piles
  • Crash wall system is a combination of site-cast concrete spandrel panels and high-strength cable barrier system