• 615.661.7979
  • 217 Ward Circle, Brentwood, Tennessee 37027
WK-Pierremount
  • DESIGN TEAM:
  • Planning / ProgrammingThe Estopinal Group, Inc.
  • ArchitectThe Estopinal Group
  • Civil EngineerAFJM, Inc.
  • General ContractorWhitaker Construction Co., Inc.
  • Structural EngineerTRC Worldwide Engineering, AFJM, Inc.
  • New Construction447,731 GSF
  • Construction Cost$56.2 Million

WK Pierremount Hospital - Shreveport, Louisiana

TRC Worldwide Engineering, Inc. provided structural engineering services to the architect on this multi-million dollar new facility. The campus has a medical office building, hospital wing, multi-level parking garage, and pediatric care facility.


Key Structural Components:
  • One-way post-tensioned concrete structure
  • Moment resisting concrete frames
  • Post-tensioned beams only
  • Conventionally reinforced slab
  • Deep foundations using drilled shafts bearing on rock