• 615.661.7979
  • 217 Ward Circle, Brentwood, Tennessee 37027
Union Replacement
  • DESIGN TEAM:
  • ArchitectThe Estopinal Group
  • ContractorGarmong/Pepper Construction
  • Structural EngineerTRC Worldwide Engineering
  • New Construction580,000 SF
  • Construction Cost$158,000,000

Union Replacement Hospital - Terre Haute, Indiana

TRC Worldwide Engineering provided the structural engineering and structural steel detailing services for this five-level replacement hospital, including a full basement. This 580,000 square foot facility will contain over 2,850 tons of fabricated steel. Key steel detailing services include erection drawings, framing plans, anchor bolt plans, shop details and checking.

Key Structural Components:
  • Concrete Shearwalls
  • Special Moment Frames
  • Composite Steel Framing
BACK TO HEALTHCARE