• 615.661.7979
  • 217 Ward Circle, Brentwood, Tennessee 37027
morton
  • DESIGN TEAM:
  • ContractorWalbridge Aldinger Company
  • ArchitectThe Ritchie Organization (TRO)
  • Structural EngineersTRC Worldwide Engineering
  • New Construction92,000 GSF
  • Construction Cost$ 12.6 million

Morton Plant Hospital - Ptak Orthopedic & Neuroscience Pavillion Clearwater, Florida

TRC Worldwide Engineering, Inc. provided structural engineering design, construction administration and threshold inspection services on this four-story, 92,000 square foot medical office building, located adjacent to the hospital. The medical facility houses an ambulatory surgery center, physical and occupational therapy, and private medical offices.

Key Structural Components:
  • Composite structural steel frame
  • Drilled caisson deep foundation system
  • Precast panel shell
BACK TO HEALTHCARE