• 615.661.7979
  • 217 Ward Circle, Brentwood, Tennessee 37027
methodist
  • DESIGN TEAM:
  • ArchitectThe Estopinal Group, Inc.
  • Structural EngineerTRC Worldwide Engineering
  • New Construction24,000 GSF
  • Construction Cost$2.6 Million

Methodist Medical Center of Oak Ridge Oak Ridge, Tennessee

TRC Worldwide Engineering, Inc. provided structural engineering services to the architect for this two-story steel framed health and fitness facility. This award-winning project is part of an on-going expansion at the hospital campus.

Key Structural Components:
  • Steel moment resisting frames
  • Reinforced concrete radiation rooms
BACK TO HEALTHCARE