This is a five-story medical building expansion project located in Bossier City, Louisiana. The job, done in SDS/2, was divided into 8 sequences. TRC detailed approximately 600 tons of structural steel in three months. In this structure, most of the bays were constructed with rigid frames. The project has been successfully erected.
BACK TO HEALTHCARE