777-fremont
  • DESIGN TEAM:
  • Developer/OwnerMartinez & Associates
  • ArchitectGromatzky Dupree & Associates (GD&A)
  • Structural EngineerTRC Worldwide Engineering
  • New Construction810,000 GSF
  • Residential/Retail/Office572,000 GSF
  • Parking Garage500-space, 238,000 GSF
  • Construction Cost$175 Million

777 Fremont - Las Vegas, Nevada

TRC Worldwide Engineering, Inc. is providing structural engineering design on this 38-story project in the historic Fremont East district of downtown Las Vegas. The tower will offer premium Las Vegas views from 350 residential units, with retail and office space on the lower levels.

The condominium will also include an attached 8-level, 500-space parking garage with a pool and tennis courts on a beautifully landscaped deck on top of the garage.

Key Structural Components
  • TOWER
  • Poured in place concrete flat slabs
  • Tunnel form walls and shearwalls
  • Drilled concrete shaft foundations with cap beams
  • Transfer beams at lower lobby
  • GARAGE
  • Precast system composed of double tees, wall panels, spandrel panels and columns
  • Poured in place concrete at pool deck area
  • Secondary framing at pool area composed of masonry and concrete over form decking