Naples Airport
  • DESIGN TEAM:
  • Owner/ClientAndrea Clark Brown Architects
  • Structural EngineerTRC Worldwide Engineering
  • New Construction10,000 GSF
  • Construction Cost$3 million

Naples Airport - General Aviation Terminal Naples, Florida

TRC Worldwide Engineering, Inc. provided structural engineering design and contract administration services on this two-story, 10,000 square foot terminal building at the existing airport. The existing single story steel terminal building was demolished and the new terminal facility was built on the same site.

Key Structural Components
  • Concrete slab-on-grade
  • Load bearing masonry walls
  • Wood truss roof system
  • Spread footing foundation system