• 615.661.7979
  • 217 Ward Circle, Brentwood, Tennessee 37027
Tampa Bay History
  • DESIGN TEAM:
  • ArchitectE. Verner Johnson & Associates Architects
  • Structural EngineersTRC Worldwide Engineering
  • New Construction60,000 GSF
  • Construction Cost$17 Million

Tampa Bay History Museum Hillsborough County, Florida

TRC Worldwide Engineering, Inc. provided structural engineering design and construction administration services on this new $17 million, 60,000 square foot up-scale museum on Tampa Bay. The structure has four levels with ground floor parking on-grade. The museum will include a visitor reception area, museum store, theme café, event room, exhibition areas, classrooms and a library/resource area, administration, storage and collection areas.

Key Structural Components
  • Reinforced concrete slabs/ joist system supported by post-tensioned beams/girders
  • Driven precast concrete pile foundation
  • Glass walls at the front and back supported by structural steel framing
BACK TO ARTS & ENTERTAINMENT