• 615.661.7979
  • 217 Ward Circle, Brentwood, Tennessee 37027
Fort Benning
  • DESIGN TEAM:
  • ClientBristol Development Group & Doster Construction Group
  • Design-BuilderTRC Construction Services
  • ContractorTRC Construction Services
  • ArchitectKA, Inc. Architects
  • Structural & Precast EngineerTRC Worldwide Engineering

Fort Benning Army Hospital Staff Visitor – Fort Benning, GA

A mixed-use project combining retail, residential and parking in a space constrained urban setting in the Gulch in Nashville, Tennessee. The original parking structure design called for a cast-in-place, posttensioned parking structure. TRC developed an integrated design, manufacturing and construction delivery system for a 6-story, 402 spaces, 147,000 SF precast parking structure at a cost reduction of 75% per space saving the client $1.5 million.

As prime designers and builders we worked with the project architects who influenced the overall aesthetics of the structure and managed the MEP design features of the project. Early release pre-cast detailing allowed our selected precast manufacturing to begin prior to completion of final plans. Additionally, foundation construction will begin before pre-cast manufacturing is completed.

Project Highlights:
  • Completely surrounded by 4-story condominiums and retail
  • Restricted access entry/exit
  • Precast 60-foot span double tee floor systems, precast vertical columns and walls
  • Pre-engineered steel roof structure for top level
  • Multiple vertical pedestrian patterns
  • Erected in 6 weeks, construction completed in 6 months
Construction Details:
  • Completion Date - March, 2008
  • Project Size - 402 Spaces
  • Project Size - 147,000 SF Total
  • Project Cost - 4.8 Million

BACK TO PORTFOLIO