Hollywood Beach Resort
  • DESIGN TEAM:
  • ArchitectAdache Group Architects
  • Structural EngineerTRC Worldwide Engineering
  • Project Size870,000 GSF (Including Garage)

Margaritaville Hollywood Beach Resort – Hollywood, FL

The resort is an 8 story hotel on top of a 9 level parking garage pedestal. The total building square footage is approximately 870,000 with a building height of 196 ft. The ground floor will consist of the lobby, kitchen, storage, receiving, FPL vault, restaurants, Margaritaville Bar & Restaurant and back of house.

The second floor houses the spa; Parking on floors 3 through 9; 10th floor consists of banquet kitchen, grand ballroom, meeting and board rooms, salons, hotel administration and housekeeping; 11th floor features a recreation deck and hotel rooms; finally the 12th through 17th floors will be additional hotel rooms.

Project Highlights:
  • Foundations: concrete pile caps and augercast piles
  • Columns: Cast-in-place concrete columns
  • Post-tensioned concrete transfer beams at levels 2 and 11
  • Garage: Cast in place post-tensioned concrete slabs
  • 11th Floor: Cast in place post tensioned concrete slab with transfer beams
  • 12th thru roof: tunnel form construction (cast in place reinforced walls and slabs)
  • Lateral load resisting system: Cast in place shear walls around elevators and stairs