• 615.661.7979
  • 217 Ward Circle, Brentwood, Tennessee 37027
image
  • DESIGN TEAM:
  • ArchitectPierce Goodwin Alexander & Linville (PGAL)
  • ContractorJames A. Cummings, Inc.
  • Structural EngineerTRC Worldwide Engineering
  • New Construction94,130 GSF - 3-Story Bldg: 60,100 SF, 2-Story Bldg: 12,250 SF, - Gym Addition: 11,480 SF, Music, Utility, Concession Bldgs: 10,300 SF
  • Construction Cost$19.4 Million
  • SHARE

McArthur High School – Phased Replacement School - Broward County (Hollywood), Florida

TRC Worldwide Engineering, Inc. provided structural engineering design, contract administration and threshold inspection services on this phased replacement high school. Phase I is a 3-story, 52-classroom addition; Phase II includes 5 additional classrooms with 3 skill labs, a vocal/music building, a new physical education addition with locker rooms, a new utility building, a concession building, plus pavilions, bleachers and pool renovations.

Key Structural Components:
  • Classrooms & Utility Buildings: Precast concrete joists / hollow core slabs, concrete beams & columns
  • Music & Gym Buildings: Steel joists & deck
  • Engineered concrete masonry
  • Concrete slab-on-grade
BACK TO PORTFOLIO