Warehouse / Distribution

H-E-B Grocery Company - Distribution Center Weslaco, Texas

H-E-B Grocery Company - Distribution Center

TRC Worldwide Engineering, Inc. provided structural engineering design and construction administration services on this single story distribution center for H-E-B Grocery Company. The main warehouse is approximately 1000' x 400' and incorporates 90' clear spans adjacent to the loading dock doors. To provide the owner with the maximum number of loading dock doors and increased productivity, a moment frame system was developed along the sides of the building. Deep foundations are common in this part of the country; however JC/TRC worked closely with the soils engineer to support the structure on shallow foundations, providing the contractor the additional flexibility required for the compressed construction schedule. The building includes office area and a mezzanine with an overhead crane system.

Key Structural Components
Shrinkage compensating slab-on-grade finished floor
Combination of vertical steel bracing and moment frames for lateral system
Foundation design for future adjacent structure
 
Design Team
Architect: Jones & Associates Architects
Contractor: Primus Builders, Inc.
Structural Engineer: TRC Worldwide Engineering, Inc.
New Construction: 411,400 GSF
Construction Cost: $23 million
TRC is referenced on Wikipedia regarding the Duke Energy Center. | Building of America Announces Ft. Lauderdale Project Chosen for Gold Medal Feature. | WK Pierremont - Medical Arts Building Award. | Two TRC Projects Win McGraw Hill/Southeast Construction Magazine Best of 2009 Awards.