precast

New Auburn Aren Auburn, Alabama

New Auburn Aren

TRC provided precast concrete engineering services for the stadium seats and walls at event level for the new multi-purpose arena located in Auburn, Alabama. The New Auburn Arena will accommodate 9,600 seats. The new arena will be the home of the Auburn University Tigers basketball teams. Projected construction cost for the facility is $92.5 million. It will contain two practice courts, a weight room, and twelve suites.

Key Structural Components
Connections
Product Designs
Erection Drawings
 
Design Team
Client: Metromont Corporation
Architect: 360 Architecture, Inc.
Contractor: BL Harbart International
Structural Engineers: Walter P. Moore
Precast Engineers: TRC Worldwide Engineering, Inc.
New Construction: 243,792 GSF
Construction Cost: $92.5 million
TRC is referenced on Wikipedia regarding the Duke Energy Center. | Building of America Announces Ft. Lauderdale Project Chosen for Gold Medal Feature. | WK Pierremont - Medical Arts Building Award. | Two TRC Projects Win McGraw Hill/Southeast Construction Magazine Best of 2009 Awards.