K-12

New Hubble Middle School Wheaton, Illinois

New Hubble Middle School

The Structural Steel Detailing Division of TRC Worldwide Engineering, Inc. will provide its services for the New Hubble Middle School project located in Wheaton, Illinois. The approximate square footage of the facility will be 187,000 and contain over 900 tons of steel. Key detailing services to include anchor bolt plans, erection drawings, shop drawings and checking.

Key Structural Components
Anchor Bolt Plans
Erection Drawings
Miscellaneous Steel
Shop Drawings / Checking
 
Design Team
Client/Fabricator: Lenex Steel
Architect: Legat Architects Construction
CM: Bovis
Steel Detailers: TRC Worldwide Engineering, Inc.
New Construction: 187,000 GSF
TRC is referenced on Wikipedia regarding the Duke Energy Center. | Building of America Announces Ft. Lauderdale Project Chosen for Gold Medal Feature. | WK Pierremont - Medical Arts Building Award. | Two TRC Projects Win McGraw Hill/Southeast Construction Magazine Best of 2009 Awards.