AVIATION

Metropolitan Nashville Airport Authority Nashville, Tennessee

Metropolitan Nashville Airport Authority Nashville, Tennessee

TRC Worldwide Engineering, Inc. provided structural engineering design services for this landside expansion project to the Nashville International Airport. The design included post-tensioned slabs, post-tensioned beams, and structural steel canopies. The project team interfaced with the contractor to minimize disruption to airport operations.

Key Structural Components
Post-tensioned concrete parking garage
Post-tensioned bridge girders
Steel pipe canopies
Cast-in-place bridge decking
 
Design Team
Architect/Engineer: Gobbell Hays Partners
Structural Engineer: TRC Worldwide Engineering, Inc.
General Contractor: Hardaway Construction
New Construction: 1,000-space
Construction Cost: $32.0 million
TRC is referenced on Wikipedia regarding the Duke Energy Center. | Building of America Announces Ft. Lauderdale Project Chosen for Gold Medal Feature. | WK Pierremont - Medical Arts Building Award. | Two TRC Projects Win McGraw Hill/Southeast Construction Magazine Best of 2009 Awards.