HEALTHCARE

Our Lady of Lourdes Hospital Lafayette, Louisiana

Our Lady of Lourdes Hospital

TRCprovided structural engineering services for this new replacement hospital designed to accommodate the addition of a medical office building. TRC is also utilizing Early Steel Detailing to produce structural steel shop drawings for approximately 3,000 tons of steel. Steel detailing will begin at the design development level of the construction document process using the structural RAM model developed by the structural engineer. Steel shop drawings should be released for fabrication approximately one month after the structural steel shell package is released.

 
Design Team
Client/Architect: The Estopinal Group / HOK
Contractor: Brasfield & Gorrie, The Lemoine Company
Structural Engineers/Steel Detailier: TRC Worldwide Engineering, Inc.
New Construction: 394,000 GSF
Construction Cost: $211 million
TRC is referenced on Wikipedia regarding the Duke Energy Center. | Building of America Announces Ft. Lauderdale Project Chosen for Gold Medal Feature. | WK Pierremont - Medical Arts Building Award. | Two TRC Projects Win McGraw Hill/Southeast Construction Magazine Best of 2009 Awards.